停車棚在建設(shè)以及施工時要注意的事項(xiàng)

來源:http://m.ajuxfs.cn/ 日期:2023-04-03 發(fā)布人:
隨著社會經(jīng)濟(jì)的迅速發(fā)展,膜結(jié)構(gòu)的停車棚的使用也越來越多,透光性是現(xiàn)代膜結(jié)構(gòu)停車棚被廣泛認(rèn)可的特性之一。膜材的透光性可以為建筑提供所需的照度,這對于建筑十分重要?,F(xiàn)在我們就來了解下濟(jì)南停車棚在建設(shè)以及施工時要注意的事項(xiàng)。
With the rapid development of social economy, the use of membrane structure parking sheds is also increasing. Light transmittance is one of the widely recognized characteristics of modern membrane structure parking sheds. The light transmittance of membrane materials can provide the required illumination for buildings, which is very important for building energy conservation. Now let's learn about the construction and precautions for parking sheds in Jinan.
A、加工準(zhǔn)備及下料:依據(jù)施工圖放樣,放樣和號料時要預(yù)留焊接收縮量和加工余量,依據(jù)放樣作樣板。
A. Processing preparation and blanking: Set out according to the construction drawing, reserve welding shrinkage and machining allowance during setting out and marking, and use the setting out as a template.
B、預(yù)埋件安裝處理:定位預(yù)埋件安裝位置,打鉆安裝。要求預(yù)埋件位置準(zhǔn)確、埋設(shè)牢固。標(biāo)高偏差不大于9mm,左右位移不大于20mm。
B. Installation treatment of embedded parts: locate the installation position of embedded parts, and drill for installation. The embedded parts shall be accurately positioned and firmly embedded. The elevation deviation shall not be greater than 9mm, and the left and right displacement shall not be greater than 20mm.
C、測量放線:依據(jù)土建標(biāo)高基準(zhǔn)線測預(yù)埋件標(biāo)高線,檢查預(yù)埋件標(biāo)高偏差、左右偏差。整理結(jié)果,確定預(yù)埋件分隔的調(diào)整處理方案。
C. Surveying and setting out: measure the elevation center line of embedded parts according to the civil engineering elevation reference line, and check the elevation deviation and left and right deviation of embedded parts. Organize the results and determine the adjustment and treatment plan for the separation of embedded parts.
D、懸掛臂安裝焊接:懸掛臂安裝采用焊接,需檢查焊接節(jié),調(diào)節(jié)懸掛臂設(shè)計(jì)坡度,準(zhǔn)確無誤方能進(jìn)行焊接??窟呉粭l懸掛臂準(zhǔn)確無誤后,安裝另一邊一條懸掛臂,就位準(zhǔn)確后點(diǎn)焊。
D. Suspension arm installation and welding: The suspension arm installation adopts welding, and it is necessary to check the welding joints, adjust the design slope of the suspension arm, and conduct welding only if it is accurate and correct. After the suspension arm on the side is accurate, install the other suspension arm, and conduct spot welding after it is correctly positioned.
濟(jì)南停車棚
停車棚在施工時的步驟:
Steps for construction of parking sheds:
一,加工準(zhǔn)備及下料:依據(jù)施工圖放樣,放樣和號料時要預(yù)留焊接收縮量和加工余量,依據(jù)放樣作樣板。
1、 Processing preparation and blanking: Set out according to the construction drawing, reserve welding shrinkage and machining allowance during setting out and blanking, and use the setting out as a template.
二,預(yù)埋件安裝處理:定位預(yù)埋件安裝位置,打鉆安裝。要求預(yù)埋件位置準(zhǔn)確、埋設(shè)牢固。標(biāo)高偏差不大于9mm,左右位移不大于20mm。
2、 Installation and processing of embedded parts: locate the installation position of the embedded parts and drill for installation. The embedded parts shall be accurately positioned and firmly embedded. The elevation deviation shall not be greater than 9mm, and the left and right displacement shall not be greater than 20mm.
三,測量放線:依據(jù)土建標(biāo)高基準(zhǔn)線測預(yù)埋件標(biāo)高線,檢查預(yù)埋件標(biāo)高偏差、左右偏差。整理結(jié)果,確定預(yù)埋件分隔的調(diào)整處理方案。
3、 Surveying and setting out: measure the elevation center line of embedded parts according to the civil engineering elevation reference line, and check the elevation deviation and left and right deviation of embedded parts. Organize the results and determine the adjustment and treatment plan for the separation of embedded parts.
四,懸掛臂安裝焊接:懸掛臂安裝采用焊接,需檢查焊接節(jié),調(diào)節(jié)懸掛臂設(shè)計(jì)坡度,準(zhǔn)確無誤方能進(jìn)行焊接??窟呉粭l懸掛臂準(zhǔn)確無誤后,安裝另一邊一條懸掛臂,就位準(zhǔn)確后點(diǎn)焊。
4、 Suspension arm installation and welding: Suspension arm installation adopts welding. It is necessary to inspect the welding joints, adjust the design slope of the suspension arm, and conduct welding only if it is accurate and correct. After the suspension arm on the side is accurate, install the other suspension arm, and conduct spot welding after it is correctly positioned.
通過以上小編的詳細(xì)介紹,我們對以上的信息有所了解,希望以上有您需要的信息,需要幫助的可以及時聯(lián)系我們。更多事項(xiàng)就來咨詢我們http://m.ajuxfs.cn吧!
Through the detailed introduction by the above editor, we have gained some understanding of the above information. We hope that you have the information you need above. If you need help, please feel free to contact us in a timely manner. For more information, please consult us http://m.ajuxfs.cn Come on!

閱讀/ Recommended reading

  在濟(jì)南地區(qū)安裝遮陽棚,需根據(jù)棚體類型、安裝環(huán)境及施工難度選擇適配工具。無論是家用陽臺遮陽棚還是商用伸縮棚,工具配置需兼顧性、精準(zhǔn)度與作業(yè)效率,確保施工過程符合建筑規(guī)范與...

濟(jì)南可移動式推拉棚可以幫助生活中有什么優(yōu)勢? 2025-06-03
濟(jì)南遮陽棚日常清洗怎么簡單有效? 2025-05-27
濟(jì)南雨棚優(yōu)選:膜結(jié)構(gòu)車棚的六大核心優(yōu)勢 2025-05-16
面對極端天氣要怎么處理遮陽棚防止被破壞? 2025-05-14

魯公網(wǎng)安備 37010302000864號

中文字幕久久九九| 91国际精品亚洲| 亚洲自拍高清| 精品无码人妻一区二区三区666| 少妇性爱正在播放| 国产香蕉尹人综合在线观看| 熟妻一区二区| 森美特電子有限公司| 精品人妻一区| 欧美日韩有码区| 色AV天堂| 国产精品国产欧美综合一区| 综合网v久久| 秋霞AV无码| 午夜偷拍精品| 国产成人aⅴ尤物国产| 国产精品亚洲一区二区在线| 久久久精品2019免费观看| 色综合合久久天天综合绕视看| 91视频黄久久久久| 亚洲无码AV一区=区| 欧美区日韩区| 精品第一区第二区| 中文字幕在线看一区视频| 午夜乡村少妇AAAAA片| 中文字幕久在线播放| 青青草无码国产亚洲| 99久久99这里只有免费精品| 亚洲乱码高清视频| 人妻一区二区三区四区兽交| 日本色大片在线观看| 久久人人爽人人人人片| 国产xxx高潮| 琪琪无码中文字幕| 一区二区三区播欧美放| 欧美俱樂部| 国产精品免费拍拍拍| 亚洲精品无码专区久久下载| 欧美在线第一二三四区| 性高朝久久久久久久久久 | 99精品久久只有精品|