久久久久国产美女免费网站,女人高潮AA大片,亚洲熟妇无码久久精品99视频,无码小穴久久久

歡迎您進入山東蘭天篷膜安裝工程有限公司 在線留言 聯(lián)系我們

服務(wù)咨詢熱線

15064156568

熱門關(guān)鍵詞: 移動推拉篷 鋼化玻璃和鋼結(jié)構(gòu) 固定停車篷

公司新聞

首頁>>新聞資訊>>公司新聞
聯(lián)系我們
山東蘭天篷膜安裝工程有限公司

聯(lián)系人:張經(jīng)理

電話:15064156568

網(wǎng)址:http://m.ajuxfs.cn

地址:山東省濟南市市中區(qū)建設(shè)路99-5號一層?xùn)|戶

停車棚施工及注意事項

來源:http://m.ajuxfs.cn/ 日期:2024-11-12 發(fā)布人:

 02 1、在施工之前,要將所有的需要使用的材料準備并安置好,避免將其放在潮濕、臟亂處,尤其是膜材,應(yīng)該使用的包裝材料裝好,等到用的時候再拆封。

  1. Before construction, all materials that need to be used should be prepared and placed properly, avoiding placing them in damp, dirty and messy places, especially for film materials. The packaging materials that should be used should be packed and opened when they are ready for use.

  2、在施工的過程中,要在附近設(shè)置好施工標志,尤其是在一些危險的地段,還應(yīng)該用護欄保護好。同時,還應(yīng)該施工場所及附近道路的暢通性。

  2. During the construction process, construction signs should be set up nearby, especially in dangerous areas, and guardrails should be used for protection. At the same time, the accessibility of the construction site and nearby roads should also be ensured.

  3、所有的建筑都需要高空作業(yè),這個時候需要格外注意施工者的性。對于要登高用的梯子,事先一定要做好仔細的檢查,同時將其固定好。梯子與地面的夾角不要超過七十度。

  3. All buildings require high-altitude operations, and special attention should be paid to the safety of the construction workers during this time. For the ladder used for climbing, it is necessary to carefully inspect it in advance and fix it properly. The angle between the ladder and the ground should not exceed 70 degrees.

  4、因為膜結(jié)構(gòu)停車棚涉及到焊接工作,因而在工作過程中要注意好,在拆卸與電力網(wǎng)相連接的部位時務(wù)必記得先斷電,如果是在公共地域焊接的話,還應(yīng)該使用擋光屏。

  4. Because the membrane structure parking shed involves welding work, safety should be taken into account during the work process. When dismantling the parts connected to the power grid, it is necessary to remember to cut off the power first. If welding is carried out in public areas, a light blocking screen should also be used.

  5、而對于一些要起吊的操作,一定要注意好和高壓線的距離,如果有必要,還應(yīng)該對高壓線路采取一定措施。另外,在安裝膜結(jié)構(gòu)停車棚的時候,一定要仔細檢查吊裝用的鋼絲繩,如果出現(xiàn)了磨損就不要使用了。

  5. For some lifting operations, it is important to pay attention to the distance from the high-voltage line, and if necessary, take certain measures for the high-voltage line. In addition, when installing the membrane structure parking shed, it is necessary to carefully inspect the steel wire rope used for lifting. If there is wear and tear, do not use it.

  6、對于所施工的場所,其采光度、通風(fēng)性和排氣性一定要好。

  6. For the construction site, its lighting, ventilation, and exhaust properties must be good.

  本文文章來源:濟南停車棚更多的內(nèi)容請進入我們的網(wǎng)站http://m.ajuxfs.cn

  Source of this article: Jinan Parking Shed. For more content, please visit our website http://m.ajuxfs.cn

閱讀/ Recommended reading

  當濟南的烈日與風(fēng)雨讓推拉蓬的遮陽布變得破舊褪色,及時更換不僅能恢復(fù)遮陽擋雨功能,還能讓戶外空間煥然一新??此茝?fù)雜的更換過程,掌握正確步驟后也能輕松完成。從準備工具到安裝收尾,這...

濟南遮陽蓬接縫 “防水保衛(wèi)戰(zhàn)”:細節(jié)之處見真章 2025-06-25
濟南雨棚:不止于遮雨的 “全能空間助手” 2025-06-20
濟南遮陽棚安裝工具詳解:從基礎(chǔ)到的全流程裝備指南 2025-06-05
濟南可移動式推拉棚可以幫助生活中有什么優(yōu)勢? 2025-06-03

魯公網(wǎng)安備 37010302000864號

五月婷婷久久激情综合| 国产98色在线|日韩| 成人电影亚洲电影AV| 无遮挡十八禁在线视频国产| 久久久久亚洲色欲Av无码裤子| 国产精品原创资源在线| 日本A在线www| 国产激情在线播放你懂的| 在线视频一区二区日韩国产| 超碰caoporen国产| 爱精品区| 天天综合久久综合电影网| 亚洲真人无码永久在线观看| 国产精品无码AV片| 免费无码一级高潮喷水网站| 色先锋资源电影| 亚洲精品中文国产综合网| 爆肛一区二区| 欧美多人激情视频在线看| 国产成人黄色网站| 久久这里只有精品免费视频| 国产又粗又大又黄| 久久亚洲精品国产AV电影| 中文字幕无亚洲欧洲日韩| 啊啊啊要射了视频| 欧欧美呦呦| 97热久久精品中文字幕一区| 青青草原综合网| 少妇人妻偷精品免费视频| 66av抽插人妻| 亚洲欧美校园人妻小说| 尤物黄色视频污在线观看| 香蕉久久香蕉| 国产精品三级无码视频| 亚洲新天堂第一页| 久久久精品人妻av一区二区| 国产自产8区| 国产精品免费精品自在线观看| 亚洲五月小说| 亚洲中文有码字幕一区二区| 色婷婷丁香在线观看|